WHATCOM WATERWAY CLEANUP OF PHASE 1 AREAS

ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

WHATCOM WATERWAY CLEANUP OF PHASE 1 AREAS

The Whatcom Waterway is located on the Bellingham Bay waterfront in Bellingham, Washington, and is currently managed by the Port of Bellingham (Port). The Whatcom Waterway site includes aquatic areas that have been impacted by contaminants historically released from industrial waterfront activities, including mercury discharges from a former Georgia Pacific (GP) chlor-alkali plant, wood waste and degradation products from historical log rafting activities, and phenolic compounds from pulp mill wastewater discharges, as well as other industrial releases. A remedial investigation/feasibility study (RI/FS) effort was completed in 2007 with the Washington State Department of Ecology (Ecology), and the first phase of cleanup is currently in the final stages of remedial design and permitting. Cleanup activities will be completed in two phases of work. Phase 1 cleanup activities, the focus of this paper, will commence in the summer of 2013 and include structure demolition, shoreline debris removal, shoreline stabilization, new bulkhead construction, remedial dredging, and placement of engineered sediment caps and dredge residuals management cover material. In total, approximately 111,000 cubic yards (85,000 cubic meters) of contaminated sediment and debris will be removed from the Whatcom Waterway during Phase 1 cleanup. This paper discusses key challenges associated with waterfront cleanup at the Whatcom Waterway site, with a focus on the remedial basis of design that was developed to meet cleanup objectives for the project. Specific topics discussed include: integration of cleanup requirements with navigation and existing tenant operational uses; design of shoreline capping and stabilization to meet geotechnical, coastal engineering, and remedial criteria; engineered capping design criteria to accommodate existing and future vessel use; and integration of aquatic habitat mitigation needs. This paper will provide an overview of the complexities associated with a multi-phase cleanup approach at the Whatcom Waterway site, including recontamination potential within the Phase 1 cleanup areas, and coordination with private and public landowners to preserve existing operational site use and account for potential future waterway use changes.

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

Leave a Reply

Your email address will not be published. Required fields are marked *