ATTENTION:
BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!
INFORMATION:
YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COST N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR
YOU CAN CALL: 08068231953, 08137701720, 09070569307, 08154275408
WHATSAPP US ON: 08137701720
EFFECTIVE SAFETY AND HEALTH PLANNING ON CONSTRUCTION SITES
ABSTRACT
The major purpose of this study was how to use good planning of construction activities to achieve safety, good health, control and prevention of accidents on building construction sites. The population of the study consisted mostly of big construction firms in Anambra State, especially Awka and Onitsha that have had more than 5 years of active construction activities. The sample for the study was 10 reputable construction firms; five from Awka and 5 from Onitsha; which were drawn using simple random sampling. Five research questions and two hypotheses were formulated, which guided the study. A 13-item structured questionnaire was developed, for data collection. Frequency count/percentages and weighted mean (likert scale) were used to answer the research questions, while Chi-square was used to test the hypotheses at 0.05 level of significance. It. Was concluded among others that: (1) The nature of construction accidents is so diverse and widespread; that if not well confronted can lead to serious and extensive consequences. (2) For effective construction accident prevention and control, monitoring and enforcement instruments are necessary. Based on the findings and the conclusions drawn from the study, recommendations were made.
TABLE OF CONTENT:
CHAPTER ONE
INTRODUCTION
1.1 Background of the Study
1.2 Statement of the Research Problem
1.3 Objectives of the Study
1.4 Significance of the Study
1.5 Research Questions
1.6 Research Hypothesis
1.7 Conceptual and Operational Definition
1.8 Assumptions
1.9 Limitations of the Study
CHAPTER TWO
LITERATURE REVIEW
2.1 Sources of Literature
2.2 The Review
2.3 Summary of Literature Review
CHAPTER THREE
RESEARCH METHODOLOGY
3.1 Research Method
3.2 Research Design
3.3 Research Sample
3.4 Measuring Instrument
3.5 Data Collection
3.6 Data Analysis
3.7 Expected Result
CHAPTER FOUR
DATA ANALYSIS AND RESULTS
4.1 Data Analysis
4.2 Results
4.3 Discussion
CHAPTER FIVE
SUMMARY AND RECOMMENDATIONS
5.1 Summary
5.2 Recommendations for Further Study
Bibliography
HOW TO RECEIVE PROJECT MATERIAL (S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to any of the numbers below
08068231953, 08137701720, 09070569307, 08154275408 (1) Your project topics
(2) Email Address
(3) Payment Name
OR you drop them on our WhatsApp, 08137701720
We will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953, 08137701720, 09070569307, 08154275408