AIR POLLUTION CONTROL WITHIN AN INDUSTRIAL ENVIRONMENT (A CASE STUDY OF PORT-HARCOURT REFINERY RIVERS STATE)

ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

AIR POLLUTION CONTROL WITHIN AN INDUSTRIAL ENVIRONMENT (A CASE STUDY OF PORT-HARCOURT REFINERY RIVERS STATE)

ABSTRACT

This work discusses air pollution control within an industrial environment (a case study of portharcourt refinery rivers state)

. A hundred and twenty questionnaires were distributed among people from portharcourt, rivers state. Interviews and surveys were also conducted.

Primary and secondary data will be used in the analysis. Tables and percentages will also be used as the instrument of analysis

It will be observed therefore that air pollution control within an industrial environment have a strong and significant positive impact on the environmental management.

TABLE OF CONTENTS
Cover Page – – – – – – – – – –
Title Page – – – – – – – – – –
Certification – – – – – – – – – –
Dedication – – – – – – – – – –
Acknowledgement – – – – – – – – –
Abstract – – – – – – – – – –
Table of Content – – – – – – – – –
Chapter One: Introduction
Background of the Study – – – – – –
Statement of the Problem – – – – – –
Objectives of the Study – – – – – – –
Research Questions – – – – – – –
Research Hypotheses – – – – – – –
Significance of the Study – – – – – – –
Scope/ Limitation of the Study – – – – – –
Definition of Terms – – – – – – –
Chapter Two: Review of Related Literature
2.1 Introduction – – – – – – – – –
2.2 Conceptual Framework – – – – – – –
2.3 Theoretical Framework – – – – – – –
2.4 Empirical Review – – – – – – – –

Chapter Three: Research Methodology
3.1 Introduction – – – – – – – –
3.1 Research Design – – – – – – – –
3.3 Area of the Study – – – – – – – –
3.4 Population of the Study – – – – – – –
3.5 Sample Size and Sampling Techniques – – – –
3.6 Instrumentation – – – – – – – –
3.7 Validation of the Instrument – – – – – –
3.8 Administration of the Instrument – – – – –
3.9 Method of Data Analysis – – – – – – –

Chapter Four: Presentation, Analysis and Interpretation of Data
4.1 Introduction – – – – – – – – –
4.2 Presentation and Analysis of Data – – – – –
4.3 Testing of Hypotheses – – – – – – –
4.4 Discussion of Findings – – – – – – –
Chapter Five: Summary, Conclusion and Recommendations
5.1 Introduction – – – – – – – – –
5.2 Summary – – – – – – – – –
5.3 Conclusion – – – – – – – – –

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

Leave a Reply

Your email address will not be published. Required fields are marked *