CHALLENGES IN ADMINISTERING THE CROSS RIVER STATE MINISTRY OF AGRICULTURE, NIGERIA

ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

CHALLENGES IN ADMINISTERING THE CROSS RIVER STATE MINISTRY OF AGRICULTURE, NIGERIA

ABSTRACT

The study was conducted to identify the challenges in administering the Cross River State

Ministry of Agriculture, Nigeria. All the staff of the ministry constituted the population for the

study. A proportionate sampling technique was used in selecting respondents, with twenty

percent (20%) of respondents from each of the departments. Thus the total sample size for the

study was one hundred and thirteen (113) respondents. Percentages, mean and frequency were

used in the presentation and analysis of the data collected. The result of the study showed that the

majority of staff (85.5%) were married and 64.5% of respondents were males; the mean age of

staff was 43.85%. About 43.5% of the respondents had Bachelor of science (B.Sc) as their

highest educational qualification, above average (55.3%) of the staff specialized in agricultural

science related discipline.

Results revealed that the State government (85.5%) was the ministry’s

major source of funding, and 80.9% indicated that fund was insufficient. They agreed the

approved budget was three hundred and sixty nine million, four hundred and nineteen thousand,

three hundred and sixty five hundred, forty one kobo (N 367,419,365.41) rather than a proposed

budget of one billion, five hundred and sixty eight million, six hundred and twenty two thousand,

eight hundred and sixty three naira, zero kobo (N1,568,622,863.00) for different departments.

The ministry is understaffed by three hundred and fifty seven persons (357) and lacks

infrastructure as only buildings for offices was indicated as available (71.8%) and functional

(62.7%) by respondents. Major constraints identified from this result were: poor funds for

purchase of equipment (M=2.18), improper and inadequate staffing (M=1.55), insufficient

electricity supply (M=2.49), inadequate funding of State ministry’s interrelationship activities

(M=2.54). Results also show that the State ministry had weak linkage with universities (M=1.31)

and the research institutes (M=1.37). Suggestions to address the challenges are: increased

budgetary allocation (54.5%), training and retraining of staff (58.2%), constant recruitment

(36.4%), funding for research work and facilities (32.7%).a

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

easyprojectmaterials.com

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

easyprojectmaterials.com.ng

http://graduateprojects.com.ng/

http://freshprojects.com.ng/

http://info247.com.ng/

Leave a Reply

Your email address will not be published. Required fields are marked *