CACCOUNTABILITY IN PUBLIC SECTOR (A CASE STUDY OF N NEWY-NORTY LOCAL GOVERNMENT OF ANAMBRA STATE)

ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

CACCOUNTABILITY IN PUBLIC SECTOR (A CASE STUDY OF N NEWY-NORTY LOCAL GOVERNMENT OF ANAMBRA STATE)

Title Page

Approval Page

Dedication

Acknowledgement

Proposal

Table of content

Chapter One

1.0 Introduction

1.1 Background of the study

1.2 Statement of the study

1.3 Objective of the study

1.4 Significance of the study

1.5 Scope of the study

1.6 Limitation of the study

1.7 Brief history of Nnewi north local government

1.8 Definition of terms

References

Chapter Two

2.0 Review Of Related Literature

2.1 Accountability and the Nigerian societal ethics and values

2.2 Evaluation of military on accountability

2.3 Methods of enforcing accountability

2.4 The role of accountability in Nnewi North local government of Anambara State

2.5 Factors that militate against accountability in the public sector.

2.6 The professional ethics of public financial management.

2.7 Accounting documents and recording transactions

2.8 References.

Chapter Three

3.0 Research Methodology

3.1 Research Design

3.2 Data Collection Method

3.3 Data Presentation And Analysis

3.4 Statement of Null and Alternative Hypothesis.

Chapter Four

4.0 Report And Data Analysis

4.1 Analysis Based On Objectives

4.2 Hypothesis Testing

4.3 Discussion

4.4 Data Analysis Of The Local Government

4.5 Organization Of The Accounts/ Finance Department

4.6 The Nnewi-North Local Government’s Accounting System.

4.7 General Financial Arrangement

4.8 Control And Reporting

4.9 Planning And Performance Evaluation

Chapter Five

5.0 Findings, Recommendations And Conclusions

5.1 Summary Of Findings

5.2 Conclusion

5.3 Recommendations

Bibliography

Appendix.

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

Leave a Reply

Your email address will not be published. Required fields are marked *